Simple question about task length change Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Hi, folks, I wonder if anyone can help me with a really simple question about tasks, dependencies, and projects as a whole.

I have a project with over 100 tasks. All the dependencies are set up (most everything is dependent) and I have already Set [the] Baseline. We're about 1 week into the project.

OK, so there's a task coming up that was scheduled for 1 day, but now I've learned it will take 2 days. If I drag and drop the right side of the task to length it to the proper (new) duration/effort, I get the violation symbol on the very next task--so I click through to OK fixing it, but then get the violation symbol on the *next* task; and so on, and so on. How do I get the entire rest of the project--all of which are dependent tasks--to shift a day over automatically?

Thanks for any info!

--Sandy Santra
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Simple question (I hope) schniggeldorf OmniFocus for iPad 2 2012-12-18 01:30 PM
Beginner's question about line length pyrogerg OmniGraffle General 1 2012-05-01 01:08 PM
How to have a task mirror the length of a task group? jamiehale OmniPlan General 1 2011-06-15 07:05 PM
Task length during drag-and-drop santra OmniPlan General 0 2009-01-09 12:07 PM
Simple Q: how do I change the language?? Jodie Bricout OmniPlan General 2 2008-03-26 10:50 AM


All times are GMT -8. The time now is 11:32 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.