I know how to get the Task View to show one day increments, in one week groups. But, when I make a task longer or shorter, it still counts the hours through the day in, I think, quarter day increments. Is there a way to get the sliders to jump in one day increments as well?
 
You'll need to bring up the Project : Information inspector and set the granularity to Daily Scheduling. After you do this, making a task longer or shorter should jump in one day increments.
 
I have "daily scheduling" selected in the project inspector, but when I type "2w" or "5w" for the duration of some tasks, they automatically convert to a duration of "2w 2h" or "5w 7h" (for example).

I have the normal work schedule defined as simply 8-5 M-F so I don't understand why it is adding some number of hours to the tasks.
 
Somehow this is related to the effort required. (I have a single resource for the entire schedule.)
If I type in the effort, then the duration is coming out correct.
If I try to type in the duration, the effort is increasing it.
 
Julia, I wonder if this isn't just a case of being tripped up by incorrect effort conversion factors. You say you have a schedule of 8-5, but you don't say whether that includes the lunch hour or not. If you have a single block for 8-5, that's 9 hours, not 8, and the effort conversion factor is likely still set to the default of 8 hours, which matches the default schedule of 8-12 + 1-5.

I wrote a post a while back that helped some readers cotton to the way this works. It's in this thread -- read it and see if that doesn't clear up the mystery. If it doesn't, I'll try again :-)
 
That was it - I never would have thought of that, but you're correct. I have an effort conversion factor of 8 hours per work day and a work day defined from 8-5 (inclusive).

Thanks for the quick reply.

Julia
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Line length increments nestorph OmniGraffle General 0 2011-07-09 02:50 PM


All times are GMT -8. The time now is 11:58 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.