I'm using OmniPlan to schedule production runs in our manufacturing facility.

We use all contract labor who are paid a piece rate per each individual task within the production schedule.

I'm curious if it's at all possible to set time and cost parameters for each task, and then tell OmniPlan the batch size to have it automatically calculate the time and cost parameters for each task (and overall project) for the entire batch?

Thank you.
 
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Another piece of info re: the multiple windows bug ext555 OmniFocus 1 for Mac 2 2007-11-26 06:00 PM
Puzzle piece stencil Doug Eh! OmniGraffle Extras 2 2007-03-12 09:45 PM


All times are GMT -8. The time now is 11:15 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.