The OF tutorials show being able to set up a project to repeat every X amount of time with an option between assigned date or completed date. In either OF 1.75 or 1.8 sneaky peek the option between those two things doesn't show up in my inspector. Neither does it show up in my iPhone. This makes a big difference to me and how I use repeating actions, how do I set this explicitly?