I've looked for the answer to this and I am sure it is something silly I am missing, but I want to make a project that is sequential and have it repeat daily. I would think I would be able to do this by making a sequential project, and in the inspector having it repeat every 1 day from assigned date, but it does not repeat. The other option that I see to have the actions themselves repeat does not work, because it is sequential, the newly created action (the next days) bumps to the top of the list, and I can never get to another action on the list (without going back to the planning mode, thereby defeating the purpose). I want to work in context mode.